I took a 4×6 post and inserted into the ground. then I proceeded to drill lots of holes all over it at an upward angle. Then I stuck dowel rods in the holes and added the bottles. Took about 30-40 minutes. I’m to lazy to try removing all the labels but a friend of mine said they would when they have time.
Here is a picture of it:
